Delhi-NCR • Pilot-ready
Industrial energy savings that pay for themselves
ArcWatt shows where power is wasted, tells you how to fix it, and generates PAT/BEE-ready reports. Install in under 60 minutes, prove savings in weeks.
No upfront cost for pilots • Edge reliability • Secure by default
Load
62%
Power factor
0.86
kWh today
1292
Live load trend (demo)
Power factor below 0.9 — enable capacitor bank
Steel & Foundry
Textile & Dyeing
Cold Storage
Hospitals
Auto Parts
Built for the factory floor
Everything focuses on quick wins first, then scale—MSMEs to large plants.
Actionable savings
Not just charts—clear recommendations with estimated ₹ impact.
Compliance-ready
Generate PAT/BEE-ready reports with traceable data.
Edge reliability
Local HMI and store-and-forward—no data loss during outages.
Fast install
Clip-on meters; zero-downtime installation.
Quick ROI
Find 5–10% savings fast, then expand across lines.
Sector-aware
Steel, textiles, cold storage, hospitals—tuned insights, not generic.
How it works
Simple path from first walk-through to site-wide rollout.
Walk-through
30–45 min plant visit to identify quick-win meters.
Instrument
Non-intrusive meters + gateway, no downtime.
Prove
See verified savings vs. baseline in weeks.
Scale
Roll across lines/sites once ROI is clear.
FAQ
How fast can we start a pilot?
Usually within 1 week after a site walk-through and meter availability.
Will this disrupt production?
No. Clip-on meters and gateway install with zero downtime.
Do we get a verified savings report?
Yes. We compare baseline vs. pilot period and share a concise PDF.
What about data security?
All data is encrypted in transit and at rest. Edge devices have unique keys.
Ready to see your savings?
Book a walkthrough or try the ROI estimator—no obligations.